M-09/M-10/M-11 Road Corridor

Lviv, Lviv Region

M-09/M-10/M-11 Road Corridor
Feasibility Study

Information is current as of September 18, 2026

Key indicators

PPP Model
DBFM / availability payment
Estimated Investment
$600-730M
Concession Period
15-20 yrs
Readiness Status
Feasibility Study
Preparation Progress68%

About the project

The project focuses on rehabilitating key sections of the M-10 and M-11 roads and providing long-term maintenance of the full length of these roads, as well as the M-09 road segment (currently under rehabilitation, due to finish by the end of 2026).

PPP object (196 km)

  • M-09: 62 km, from Lviv to BCP "Rava-Ruska/Hrebenne"
  • M-10: 62 km, from Lviv to BCP "Krakovets/Korczowa"
  • M-11: 72 km, from Lviv to BCP "Shehyni/Medyka"

Key facts

  • Core EU-Ukraine logistics corridor linking Lviv with 3 of the busiest border crossing points to Poland
  • High-capacity transport route, combining intensive passenger and freight traffic flows
  • Part of the core and comprehensive TEN-T network, including the North Sea-Baltic Corridor, ensuring long-term relevance for the European transport system
  • Key logistics backbone for the Lviv region, facilitating efficient distribution of goods and transit flows towards and from the EU
  • Brings positive economic value and Value-for-Money compared to traditional procurement

Scope of works

  • 129 km of capital repair on M-10 and M-11 - upgrading a two-lane road to a three-lane road; required 2-3 years for M-10 and M-11 respectively
  • 5.5 km of new construction on M-11 - finalization of the Horodok bypass with a two-lane road; required 2 years

Project status

  • Planned to be implemented as an availability-payment-based PPP
  • Design documentation mostly developed
  • Land mostly secured

Key private partner’s responsibilities

  1. Receiving relevant approvals
  2. Financing for initial capital investments
  3. Design
  4. Road rehabilitation works
  5. Road maintenance in accordance with contracted KPIs

Next steps

  1. Finalize concept note
  2. Develop feasibility study and perform efficiency analysis
  3. Tender preparation
  4. Tendering

Other projects in this sector

Lviv Northern Bypass
Feasibility Study

Lviv Northern Bypass

Lviv, Lviv Region

$335-410M15-20 yrs
National Weight-in-Motion (WIM) System
Feasibility Study
M-07/M-19 Road Corridor
Preliminary Feasibility Study

M-07/M-19 Road Corridor

Lutsk, Volyn Region

$300-360M15-20 yrs

Other projects in this region