M-07/M-19 Road Corridor
Lutsk, Volyn Region
Preliminary Feasibility Study
Information is current as of September 18, 2026
Key indicators
- PPP Model
- DBFM / availability payment
- Estimated Investment
- $300-360M
- Concession Period
- 15-20 yrs
- Readiness Status
- Preliminary Feasibility Study
Preparation Progress40%
About the project
The project involves rehabilitation of key sections of the M-07 and M-19 highways, and maintenance of the whole Yahodyn-Kovel-Lutsk corridor, aimed at improving road technical condition, safety and operational performance.
PPP object (128.3 km)
- M-07: Kyiv-Kovel-Yahodyn (towards Lublin), from the Yahodyn-Dorohusk BCP to Kovel - 69.6 km
- M-19: Domanove-Kovel-Chernivtsi-Treble, from Kovel to Lutsk - 58.7 km
Key facts about the road corridor
- Core EU-Ukraine logistics corridor, connecting north-west Ukraine with Poland and supporting cross-border mobility
- Major freight and transport route, facilitating international trade flows as well as humanitarian and military logistics
- Part of the North Sea-Baltic TEN-T network, reinforcing Ukraine’s integration into the European transport system
- Key regional backbone for Volyn and neighboring regions, linking Western Europe with major nodes (Kovel, Lutsk) and the wider Ukrainian road network
- Brings positive economic value and Value-for-Money compared to traditional procurement
Scope of works
- 35.2 km of M-07 reconstruction - upgrading a two-lane road to a four-lane road; 3 years for design and construction
- 32.7 km of M-19 and M-07 capital repair - no change to the existing two-lane configuration; 2 years for design and construction
Project status
- Planned to be implemented as an availability-payment-based PPP
- Design documentation partially developed
- Land mostly secured
Key private partner’s responsibilities
- Receiving relevant approvals
- Financing for initial capital investments
- Design
- Road rehabilitation works
- Road maintenance in accordance with contracted KPIs
Next steps
- Finalize concept note
- Develop feasibility study and perform efficiency analysis
- Tender preparation
- Tendering