M-09/M-10/M-11 Road Corridor
Lviv, Lviv Region
Feasibility Study
Information is current as of September 18, 2026
Key indicators
- PPP Model
- DBFM / availability payment
- Estimated Investment
- $600-730M
- Concession Period
- 15-20 yrs
- Readiness Status
- Feasibility Study
Preparation Progress68%
About the project
The project focuses on rehabilitating key sections of the M-10 and M-11 roads and providing long-term maintenance of the full length of these roads, as well as the M-09 road segment (currently under rehabilitation, due to finish by the end of 2026).
PPP object (196 km)
- M-09: 62 km, from Lviv to BCP "Rava-Ruska/Hrebenne"
- M-10: 62 km, from Lviv to BCP "Krakovets/Korczowa"
- M-11: 72 km, from Lviv to BCP "Shehyni/Medyka"
Key facts
- Core EU-Ukraine logistics corridor linking Lviv with 3 of the busiest border crossing points to Poland
- High-capacity transport route, combining intensive passenger and freight traffic flows
- Part of the core and comprehensive TEN-T network, including the North Sea-Baltic Corridor, ensuring long-term relevance for the European transport system
- Key logistics backbone for the Lviv region, facilitating efficient distribution of goods and transit flows towards and from the EU
- Brings positive economic value and Value-for-Money compared to traditional procurement
Scope of works
- 129 km of capital repair on M-10 and M-11 - upgrading a two-lane road to a three-lane road; required 2-3 years for M-10 and M-11 respectively
- 5.5 km of new construction on M-11 - finalization of the Horodok bypass with a two-lane road; required 2 years
Project status
- Planned to be implemented as an availability-payment-based PPP
- Design documentation mostly developed
- Land mostly secured
Key private partner’s responsibilities
- Receiving relevant approvals
- Financing for initial capital investments
- Design
- Road rehabilitation works
- Road maintenance in accordance with contracted KPIs
Next steps
- Finalize concept note
- Develop feasibility study and perform efficiency analysis
- Tender preparation
- Tendering