Container Terminal of the Port "Chornomorsk"
Chornomorsk, Odesa Region
Feasibility Study
Information is current as of September 18, 2026
Key indicators
- PPP Model
- Concession
- Estimated Investment
- $50M
- Concession Period
- 40 yrs
- Estimated Budget Revenues / Year
- $28M
- New Jobs
- 1,000
- Readiness Status
- Feasibility Study
Preparation Progress75%
About the project
Historically, the most powerful container terminal in Ukraine operated on the territory of the Chornomorsk Port under the management of a private operator, handling about 50% of the Ukrainian market. The concession will unlock a potential of 500,000+ TEU/year.
Investment commitments
Projected capacity of the concession object within 3 years from the beginning of the concession:
- From 3.0 million tons of general and bulk cargoes
- From 250 thousand TEU of containers
Assets to be transferred to the concession
ChMP (CSPC):
- Real estate objects (buildings, structures, sites) within berths No. 1-6
- Machinery and equipment (crane equipment, gripping mechanisms) within berths No. 1-6
- Vehicles within berths No. 1-6
SE "USPA":
- Berths No. 1-6
- Buildings and structures
- Machinery and equipment (electric trucks, etc.)
Expected results
- From $50 million minimum investment
- From $1,120 million in revenues to budgets over the concession period
- 1,000+ jobs retained
- Retention and indexation of salaries and a prohibition on layoffs for 5 years
Current project implementation status
Materials are available on the website of the Ministry for Recovery, Infrastructure and Transport of Ukraine.