National Weight-in-Motion (WIM) System
Feasibility Study
Information is current as of September 18, 2026
Key indicators
- PPP Model
- DBFM / availability payment
- Estimated Investment
- $59-77M
- Concession Period
- 7 yrs
- Estimated Budget Revenues / Year
- $10M
- Readiness Status
- Feasibility Study
Preparation Progress55%
About the project
The national WIM monitoring network is treated as a single investment asset. The scope of the PPP is 35 WIM complexes in 11 regions: Vinnytsia, Dnipropetrovsk, Kyiv, Kirovohrad, Lviv, Rivne, Odesa, Ternopil, Mykolaiv, Cherkasy, and Chernivtsi. WIM sites in proximity to the frontline are not included in the project scope as a risk-mitigation measure.
Indicative financial analysis (amounts in EUR, excl. VAT unless stated)
- Project cost structure: CAPEX ≈ EUR 27 million; OPEX ≈ EUR 49,000 per WIM site per year (≈ EUR 13 million over the 7-year operating period); major overhaul in Year 6 ≈ EUR 7 million; total project cost (CAPEX + OPEX + major overhaul + margin + contingency) ≈ EUR 59 million; total lifecycle cost including debt service (incl. VAT) ≈ EUR 77 million
- Availability payments: average annual availability payment ≈ EUR 10 million (excl. VAT) / ≈ EUR 11 million (incl. VAT)
- Economic performance: Economic Net Present Value (ENPV) +EUR 67 million; Economic Internal Rate of Return (EIRR) 53%; Benefit-Cost Ratio (BCR) 2.58
- Value for Money (VfM): +EUR 0.3 million
The project demonstrates strong economic viability while delivering a positive Value-for-Money outcome under the PPP model.